111
NOTE: The drive sleeve is tapered and will slide fully into the propel-
ler as the nut is tightened and properly torqued.
7 Align splines and place propeller on propeller shaft.
8 Install drive sleeve and locking tab washer.
9 Install propeller nut. Tighten nut securely. A minimum of 55 lbs. ft.
(75 N·m) torque is required. Bend three tabs on tab washer down into
grooves in spline washer. After first use, bend the three tabs straight,
retighten propeller nut to minimum 55 lbs. ft. torque (75 N·m). Bend
tabs back down into spline washer. Check propeller at least after 20
hours of operation. Do not operate with loose propeller.
Kommentare zu diesen Handbüchern